What is the lead time?
OEL® 100 Cal/cm2 CAT 4 Jacket and Bib Overalls Arc Flash Protection Kit with Switchgear Hood with Dual Fans, NFPA 70E, Brown - Large.
Status:
Open Dec 18, 2025 - 08:14 AM
1answer
Answer
Dec 18, 2025 - 08:14 AM
There is currently one OEL® 100 Cal/cm2 CAT 4 Arc Flash Protection Kit in stock (Large, Brown)—typically ships within 1-2 business days. If the item is out of stock, the usual lead time for fulfillment is approximately 2-3 weeks.